Before you can change a building, you have to know what is there. That sounds obvious, but it is the step that gets skipped most often, and skipping it is where a lot of project problems begin.

As-built drawings are how you know what is there. They are the foundation of the project in the same way a concrete foundation is the base of a house. Everything else sits on top of them.

EVERY STEP RESTS ON THE ONE BELOWAS-BUILT DRAWINGSwhat is really there todayDESIGNdrawn on top of the as-builtsPERMITS + PRICINGapproved and priced from the designCONSTRUCTIONbuilt from the approved plans
Design, permits, pricing, and construction all rest on the as-builts.

What sits on top of the as-builts

The design

An architect or designer does not start with a blank page. They start with a drawing of your existing building and draw the changes on top of it. If that starting drawing is wrong, the design is wrong too, even if it looks perfect on screen.

The permit

Most cities want to see the existing building and the proposed changes side by side. The "existing" drawings in a permit set are as-builts. If they do not match the real building, the plans can be sent back for corrections, and that costs weeks.

The price

Contractors price a job from the drawings: how many feet of wall, how many square feet of floor, how many cabinets. Wrong sizes mean a wrong price. That usually shows up later as a change order, which is an extra bill in the middle of the job.

The construction

Cabinets, countertops, doors, and windows are ordered to exact sizes. Many of them cannot be returned. They are ordered from the drawings, so the drawings have to be right.

What happens when the starting point is wrong

Here is a simple example. An old plan says a kitchen wall is 12 feet long. The cabinets are ordered to fill 12 feet. On install day, the wall turns out to be 11 feet 7 inches. The last cabinet does not fit.

12'-0"OLD PLANwhat the drawing saysfour cabinets ordered to fill 12 feet11'-7"REAL WALLwhat we measured5" too longfound on install daythe last cabinet does not fit
Five inches is enough to stop a kitchen install.

Now the cabinet has to be rebuilt, the installer has to come back, and the countertop that was cut to match has to be redone. A small error on paper turned into weeks of delay and a real cost.

The same thing happens with walls that are not where the plan shows them, ceilings that are lower than expected, and windows that were moved years ago.

A mistake costs more the later you find it

On paper, fixing a wrong measurement takes a few minutes. Once materials are ordered, it costs money. Once things are built, it costs a lot more. As-builts move the surprises to the very start, when they are cheapest to deal with.

"But I already have the plans"

Many owners do have a set of old plans. They are useful, but they have two problems.

  • The building was not built exactly like the plans. Small changes are made during construction and rarely drawn.
  • The building has changed since. Remodels, additions, new equipment, and repairs add up over the years.

We cover this in more detail in As-Built Drawings vs. Original Plans.

The best time to get as-builts

At the very beginning, before design starts. That way your designer works from real numbers from the first day, and everyone after them does too.

It is also a small part of the budget. A floor plan starts at $750, the site visit takes about 30 minutes for a typical home, and floor plans are delivered within 3 days. Compared to one reordered set of cabinets, it is inexpensive insurance.

The short version

  • Design, permits, pricing, and construction all depend on knowing what is there.
  • As-built drawings are how you know.
  • Getting them first is far cheaper than finding the problems during construction.